Resources such as labour materials and energy are known as in the transformation process

Which of the following phrases best describes the concept of coordinating principles?

When you are interested in a new facility, what action should you take first?

Which of the following describes why the project closure phase is not done?

What is needed to calculate sigma?

Integrated service providers (ISP) is

Resources such as labor materials and energy are known as ___ in the transformation process

A series of quality assurance standards designed to ensure consistent product quality under many conditions is known as

The raw materials, components, completed or partially completed products, and pieces of equipment a firm uses are often referred to as

In a large company, the department charged with determining the actual processes to be used in turning inputs to outputs is

Which of the following brings all resources required to create a product to a central location?

  1. Home
  2. Bachelor of Business Administration (BBA)
  3. Production Management
  4. set 2

a. Begins with a delivery date ,then each operations is offset one at a time ,in reverse order

B. Is well suited where the supplier is usually able to meet precise delivery dates

c. Tends to minimize in process inventory

d. Assumes that procurement of material and operations start as soon as requirement are known

a. Routing file

B. Work centre master file

c. Control files

d. Item master file

a. A progress file

B. A work centre master file

c. Minimizing WIP inventory

d. Maximizing utilization

a. Work centre master files

B. Routing files

c. Item master files

d. Control files

a. Routing files

B. Work centre master files

c. Control files

d. Item master files

a. Assign dates to specific jobs or operations steps

B. Specifies the order in which jobs should be done at each center

c. Assigns jobs to work centers

d. Assign workers to jobs

a. Assign dates to specific jobs or operations

B. Assign jobs to work centers

c. Specifies the order in which job should be done at each centre

d. Assigns workers to jobs

a. Minimum average lateness

B. Maximum utilization

c. Maximum effectiveness

d. Minimum average flow time

a. Output

B. Intangibles

c. Factors of production

d. Inputs

a. Inventory

B. Order quantities

c. Production

d. Outputs

a. Marketing research

B. Engineering

c. Operations

d. Product planning

a. Procurement

B. Logistics

c. Production

d. Materials management

a. Operations management

B. Manufacturing

c. The transformation process

d. Production

a. Nature and consumption of output

B. Uniformity of inputs

c. Uniformity of outputs

d. Nature and consumption of input

a. The transformation process

B. Manufacturing

c. Materials management

d. Physical distribution

a. Quality

B. Customer satisfaction

c. Effectiveness

d. Productivity

a. Customization

B. Standardization

c. Engineering

d. Mechanization

a. Customization

B. Standardization

c. Engineering

d. Mechanization

a. Consumption

B. Disposition

c. Budgeting

d. Purchasing

a. Scheduling

B. Critical path

c. Transformation path

d. Routing

a. Flexible scheduling

B. Cycle time arrangement

c. Materials requirements planning

d. Economic order quantities

a. Manufacturing

B. Production

c. Operations

d. The transformation process

a. Economic order quantities

B. Production schedules

c. Product specification

d. Quality

a. Selecting the source

B. Placement of purchase order

c. Physical control of materials

d. None of these

a. To decouple or separate parts of the production process

B. To provide a stock of goods and will provide a selection for customers

c. To take advantage of quantity discounts

d. To minimize holding costs

Tags

Question and answers in Production Management,

Production Management Multiple choice questions and answers,

Important MCQ of Production Management,

Solved MCQs for Production Management,

Production Management MCQ with answers PDF download

What are the transformed resources?

Transformed resources – pertains to those that are transformed by the operation to produce the goods or services. This includes materials, information, and customers. Transforming resources – pertains to those that are used in the transformation process.

What is transformational process?

A transformation process is any activity or group of activities that takes one or more inputs, transforms and adds value to them, and provides outputs for customers or clients.

What are inputs in the transformation process?

Operations is often defined as a transformation process. Inputs such as raw materials, labor, equipment, and capital are transformed into outputs (goods and services). Customer feedback is used to adjust the transformation process.

What are the types of transformation process in operations management?

Walley (2017) identifies three types of transformation processes: material processing. information processing. customer processing.